Salters Point 2008

The Brief

From the initial design scope the project remained loyal to the pre-cabling design with only cabinetry variations being implemented.

The theatre room was a dual purpose room that served as an entertaining atmosphere and as a relaxing bar environment. Keeping sound isolation was not originally designed in the builder’s architectural plans. We worked closely with the builders to ensure specification was changed to accommodation the correct installation materials. A challenge in this project was working with the interior designers to ensure both aesthetics and audio-visual placement worked concisely together.